Please use this identifier to cite or link to this item: http://www.aiktcdspace.org:8080/jspui/handle/123456789/2631
Title: Planning, designing, estimation and scheduling of AIKTC hostel building
Authors: Gawade, Prathamesh P
Shaikh, Saquib I (14DCES73)
Baqi, Tabish U (13CES60)
Shaikh, Abdul Ahad (15DCES82)
Sayed, Fahad(13CES45)
Keywords: Project Report - CE
Issue Date: May-2018
Publisher: AIKTC
Series/Report no.: Accession # PE0402;
Abstract: The following project deals with the planning, analysis, designing, quantity and cost estimation and scheduling of a 4-storey Hostel building using advance Civil Engineering softwares like AutoCAD, ETABS, Primavera P17 and Microsoft Excel Spreadsheet. Project starts with planning of the building using AutoCAD. Then analysis of building is carried out using ETABS and Microsoft Excel Spreadsheet. Also detailing of reinforcement is done in ETABS. Then for quantity and cost estimation Microsoft Excel Spreadsheet. Further scheduling and monitoring was done on the software Primavera P17.
Description: Submitted in partial fulfilment of the requirements for the degree of Bachelor of Civil Engineering
URI: http://www.aiktcdspace.org:8080/jspui/handle/123456789/2631
Appears in Collections:Project Reports - CE

Files in This Item:
File Description SizeFormat 
PLANNING, DESIGNING, ESTIMATION & SCHEDULING OF AIKTC HOSTEL BUILDING.pdf5.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.