Please use this identifier to cite or link to this item: http://www.aiktcdspace.org:8080/jspui/handle/123456789/1807
Title: Planning and scheduling of a high rise building using primavera
Authors: Jadhav, Umesh
Khan, Muhammad (12CE32)
Khokar, Abdul (12CE39)
Khan, Mubashir (12CE42)
Keywords: Project Report - CE
Issue Date: May-2016
Publisher: AIKTC
Abstract: With the onset of High Rise Buildings in metropolitan cities, planning and scheduling has become a major concept to be considered for a smooth execution of construction works. Oracle’s Primavera P6 is an effective tool for determining an ideal schedule for construction activities. This project serves as a perfect reference frame for scheduling different High Rise Buildings. All the important steps like creating an EPS, creating a WBS, linking of activities according to their interdependence and availability of resources, reduction of float values, and determination of Critical Path are clearly exhibited in this report.
Description: Keywords: Planning, Scheduling, High Rise Buildings, Primavera, Critical Path, Gantt Charts,
URI: http://www.aiktcdspace.org:8080/jspui/handle/123456789/1807
Appears in Collections:Project Reports - CE

Files in This Item:
File Description SizeFormat 
PE0078.pdf1.81 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.